On this page, you’ll find all the real-time information concerning the slopes and lifts. No more unpleasant surprises!
-
open
-
In preparation
-
closed
Le Châble-Verbier
Cable car
open
Barnes Line
Cable car
in preparation
Chaux-Express
Télémixte
in preparation
Last status change 20.01.2025 21:50
Verbier-Savoleyres
Cable car
in preparation
La Tzoumaz-Savoleyres
Cable car
in preparation
Last status change 20.01.2025 21:50
Châble-Mayens de Bruson
Cable car
in preparation
Pasay
Chairlift - 6 persons
in preparation
Last status change 20.01.2025 21:50
Ethérolla
Chairlift - 4 persons
in preparation
Chairlift
Les Masses
Chairlift - 4 persons
in preparation
Chairlift
Matze
Télémixte
in preparation
Gondola Chairlift Mixed
Novelly
Chairlift - 4 persons
in preparation
Technical data
Type: detachable 4-seater chairlift
Length: 1479 m
Vertical drop: 505 m
Duration of run: 4 min 50 sec
Hourly capacity: 2000 p/h
Year of construction: 2005
Type: detachable 4-seater chairlift
Length: 1479 m
Vertical drop: 505 m
Duration of run: 4 min 50 sec
Hourly capacity: 2000 p/h
Year of construction: 2005
Piste de l'Ours
Cable car
in preparation
Siviez - Plan du fou
Cable car
in preparation
Technical data
Type: 8-seater gondola lift
Length: 1870 m
Vertical drop: 708 m
Running time: 6 min 30 sec
Hourly capacity: 2000 p/h
Year of construction: 2013
Type: 8-seater gondola lift
Length: 1870 m
Vertical drop: 708 m
Running time: 6 min 30 sec
Hourly capacity: 2000 p/h
Year of construction: 2013
Tortin
Chairlift - 4 persons
in preparation
Technical data
Type: 4-seater detachable chairlift
Length : 2500 m
Drop: 550 m
Running time: 11 min
Hourly capacity: 1500 p/h
Year of construction: 1988
Refurbishment: 2015
Type: 4-seater detachable chairlift
Length : 2500 m
Drop: 550 m
Running time: 11 min
Hourly capacity: 1500 p/h
Year of construction: 1988
Refurbishment: 2015
Trabanta
Chairlift - 4 persons
in preparation
Tracouet
Cable car
in preparation
Technical data
Type: 8-seater gondola lift
Length: 2293 m
Vertical drop: 815 m
Duration of run: 8 min 00 sec
Hourly flow: 2400 p/h
Year of construction: 1992
Last modification : 2011
Type: 8-seater gondola lift
Length: 2293 m
Vertical drop: 815 m
Duration of run: 8 min 00 sec
Hourly flow: 2400 p/h
Year of construction: 1992
Last modification : 2011
Veysonnaz
Cable car
in preparation
The eight-seater gondola in Veysonnaz connects the resort to the arrival station at 2,121 metres above sea level and is thus a gateway to the 4 Vallées ski domain.
Located in the heart of the resort of Veysonnaz, next to the hotel and restaurant Le Magrappé, this gondola takes you over the secluded mid-mountain chalets. Enjoy the magnificent view over the Rhone Valley, Nendaz and the Bernese Alps.
- Durationt : 8 minutes
- Capacity : 1'600 passengers/hour
- Built in : 2005
In winter, this lift allows you to reach two snow gardens, the piste de l'Ours, the piste des Mayens, the ski slopes of Thyon, the link to Siviez, as well as the restaurants of La Combyre, Mont-Rouge and the bar Le Tipi.
In summer, this installation allows you to reach the departure point of several walks including the tour of Mont-Rouge, the bisse de Chervé, the masks path, as well as the restaurants of La Combyre, Mont-Rouge and the bar Le Tipi.
Located in the heart of the resort of Veysonnaz, next to the hotel and restaurant Le Magrappé, this gondola takes you over the secluded mid-mountain chalets. Enjoy the magnificent view over the Rhone Valley, Nendaz and the Bernese Alps.
- Durationt : 8 minutes
- Capacity : 1'600 passengers/hour
- Built in : 2005
In winter, this lift allows you to reach two snow gardens, the piste de l'Ours, the piste des Mayens, the ski slopes of Thyon, the link to Siviez, as well as the restaurants of La Combyre, Mont-Rouge and the bar Le Tipi.
In summer, this installation allows you to reach the departure point of several walks including the tour of Mont-Rouge, the bisse de Chervé, the masks path, as well as the restaurants of La Combyre, Mont-Rouge and the bar Le Tipi.
Tortin-Gentianes
Aerial cableway
in preparation
Mont-Fort
Aerial cableway
in preparation
Jumbo
Aerial cableway
in preparation
Last status change 20.01.2025 21:50
Last update 20.01.2025 21:39