• Téléverbier
  • Installations
Télémixte

Work starts on the Esserts-Savoleyres Télémixte hybrid lift

Date

In the bright sunshine, Téléverbier’s chief executive officer broke ground with the first shovelful of earth, officially launching the construction of the future Télémixte hybrid lift connecting the Savoleyres-La Tzoumaz ski area to Verbier.

After many years of waiting, the project finally obtained all of the required permissions to begin work. The second section of this new installation is set to open in winter 2025–2026, and the entire line will be fully operational in 2026.

The end of a long journey
The initial version of this project, devised in 2011, has been significantly improved over the years thanks to technical advances and a reassessment of Téléverbier’s needs. The new project has also taken into account the concerns of critics and the community, leading to an amicable agreement.

A modern, first-class ski lift
The Télémixte lift is a modern, top-quality installation in accordance with the latest industry standards. The lift features a ten-seater cable car connecting Les Esserts (1,700m) to the summit of Savoleyres (2,200m) and a six-seater chairlift linking Les Planards middle cable car station to Savoleyres mountain station. Comprised of three separate stations, this installation has been developed for optimum comfort and convenience with boarding on the same level to facilitate access for people with reduced mobility, buggies, and bikes in the summer season. This new construction will replace two lifts from the 1970s: the Savoleyres cable car and the Sud ski lift. More than just a replacement, the Télémixte lift aims to improve customer experience by making the journey between Verbier and La Tzoumaz easier, faster and more comfortable for everyone.

Verbier and La Tzoumaz connected at last!
A new piste will be introduced between Le Carrefour and the departure station of the new lift, creating a direct skiable route from the Les Ruinettes sector. This long-awaited project represents a key phase in the development of the Verbier 4Vallées ski area.
 

TECHNICAL DATA

Capacity of the Esserts-Planards line (people per hour) 1,675 
Capacity of the Planards-Savoleyres line (people per hour) 2,650
Cable car model Omega V 
Chairlift model Doppelmayr/Garaventa– Type DCD6-M 
Operating speed of both lifts 6 m/s
Journey time Esserts – Planards : 6.48 min
Planards-Savoleyres : 5.29 min
 

press images

download details
Start of work on the Télémixte cable car, Verbier 4Vallées
Installations

Start of the Télémixte work

4062 x 2863 px
download details
Télémixte: station amont
Installations

Top station

7840 x 5227 px
download details
Télémixte, station avale
Installations

Bottom station

8256 x 5504 px
download details
Télémixte: station intermédiaire
Installations

Intermediate station

7603 x 5069 px
Laurent Vaucher
CEO